storiet v.2
sign in
Capa de Ten West Link transmission line project

a novel ·

Ten West Link transmission line project

por

Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, …

start reading + shelf
  • ● 83% match for you

the long version

Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, from the Delaney Substation near Tonopah, Arizona, to the Colorado River Substation near Blythe, California...The Proposed Action is 114.3 miles long and generally follows the existing Devers to Palo Verde transmission line, including a 24.9-mile long crossing of the Kofa National Wildlife Refuge (NWR). The Agency Preferred Alternative is 125.0 miles long, utilizes BLM utility corridors, and does not cross the Kofa NWR.

M

Margaret's verdict

"Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes …"

— Margaret

highlights

what readers held onto

No highlights yet. Be the first.

discussion

what readers said

No reviews yet. Finish it; tell us what you found.